Monday, May 15, 2006

kneel before zod!

Here is the order I have been cleaning & repairing. It consists of 139- 50' reels, 3- 200' reels, and 15- 400' reels. They are not all full, but if you did the math the total would come out to 13,550' of film. This will take several days to transfer and I look forward to it. I absolutely enjoy getting these huge projects. Each 50' reel runs about 3 to 3.5 mins long. The 200' reels run about 12 mins long. The 400' reels run between 20-25 mins long. All film is transferred in realtime and it takes longer than one would realize. I did a test run on another order. I ran two 400' reels in about 1.25 hours. There is downtime between reels due to having to switch them out & everything.

No comments: